EMINENCE Stream 'Critical Path' Track
July 23, 2013, 11 years ago
Brazilian metallers EMINENCE will release their fourth full-length album, The Stalker, on August 13th via CDBaby, iTunes and Amazon. For the album recordings, Eminence reunited with Danish producer Tue Madsen (MOONSPELL, THE HAUNTED, SICK OF IT ALL), who also produced their well-received 2008 album The God Of All Mistakes. Recording took place at Minerio de Ferro Studios in Belo Horizonte, Brazil.
The Stalker tracklisting:
'Self Rejection'
'Unfold'
'3 Times 6'
'Atmosphere' (intro)
'Veins Of Memories'
'The Stalker'
'Eyetricity'
'Satellite' (intro)
'Critical Path'
'No Code'
'Visions Of Hate'
'Critical Path':
'Unfold':
'No Code' lyric video:
Album teaser:
As previously reported, bassist Paulo Xisto Pinto, Jr. of SEPULTURA fame makes a guest appearance on the record.
“It was a great pleasure to once again work with my dear friend,” says Eminence’s guitarist/founding member Alan Wallace about being joined in the studio by Paulo Jr. The two also perform together in Brazilian metal project The Unabomber Files.
Video footage of Wallace, Madsen and singer Bruno Paraguay recording with the Sepultura bassist can be seen below:
Eminence is:
Alan Wallace (guitars)
Bruno Paraguay (vocals)
Andre Marcio (drums)
Thiago Correa (bass)
More on Eminence at this location.